Public consultation on proposals for a data centre and public open space at The Ridgeway, next to M25 Junction 24

Orbital Data Centres is consulting on proposals for a new data centre and publicly accessible open space on land between The Ridgeway and the M25, next to Junction 24. Our plans are at an early stage, and we want to hear your views before we finalise them.

​

This website sets out our emerging proposals and explains how you can give us your feedback. Your comments will help shape the final plans before planning applications are submitted to Enfield Council and Hertsmere Borough Council. The consultation closes on Sunday 22 November.

Public exhibitions

Monday 09 November

Time: 2pm - 8pm

Location: Wyllyotts Theatre & Cinema, Potters Bar

​

On Monday 09 November, from 2pm to 8pm, we will be holding a public exhibition event at Wyllyotts Theatre & Cinema, Potters Bar, EN6 2HZ.

Tuesday 10 November

Time: 2pm - 8pm

Location: West Lodge Park Hotel, Enfield

​

On Tuesday 10 November, from 2pm to 8pm, we will be holding a public exhibition event at West Lodge Park Hotel, Enfield, EN4 0PY.

At these events, you can meet members of the project team, find out more about the proposals and give us your feedback.

Location

The site is around 29 acres (11.65 hectares) of land next to Junction 24 of the M25, between The Ridgeway (A1005) and the motorway. It lies partly in the London Borough of Enfield and partly in Hertsmere, so each council will decide on the proposals for the land in its area.

​

The proposed application boundary also includes short sections of The Ridgeway, where works would be needed to form the new entrance and to potentially place power cables underground. The overhead power lines that currently cross the site would be removed.

Red Line Map.png

Our proposals

Data centre

The proposals are for two data centre buildings and ancillary infrastructure with approximately 50,000 square metres of floorspace in total. The site would also include an electricity substation, a gatehouse, parking, service areas and the plant needed to operate the buildings.

Landscape and nature

More than 50% of the site would remain green, with 640 new trees planted. In addition to this new woodland and tree planting, there would be wetland and grassland habitats, landscaped drainage features, wildlife corridors and landscaped earth banks to screen the buildings. About one-third of the green space (2 hectares or almost 5 acres) would be open to the public and benefit from new footpaths.

Electricity, cooling and water

The buildings are being designed with a closed-loop cooling system, which recirculates the same water rather than continually drawing fresh water from the mains. We are also exploring whether surplus heat from the buildings could be reused, for example to heat nearby buildings. The data centre would be powered from the national electricity grid through a new connection and its own substation, and would not use on-site power generation for its day-to-day operation. Like all data centres, it would have emergency back-up generators. These would only be used if the grid supply failed, and for short routine tests.

Access, traffic and construction

The main entrance would be from The Ridgeway at the eastern end of the site, with a gatehouse where all vehicles would be checked. A second entrance at the western end of the site would be used by emergency vehicles. Construction traffic would be carefully managed, with agreed routes and timings, including avoiding school drop-off and pick-up times.

image003.png

The economy and jobs

An investment of over £1.5 billion in construction and fit-out

Between 1,400 and 1,700 construction jobs a year while being built

Approximately 170 jobs on site once open, including engineers, technicians and security staff

Around 85 more jobs in the wider area through the supply chain and staff spending

A £30 million a year boost to the local economy

An estimated £6.8 million a year in business rates, of which around £2.7 million would be kept by local councils to help pay for local services

Your questions answered

Have your say

We want to hear from residents, businesses and community groups in Enfield, Hertsmere and neighbouring parts of Welwyn Hatfield. Please send us your comments by Sunday 22 November.

​

Once the consultation closes, we will consider all the feedback we receive before finalising our plans and submitting planning applications to Enfield Council and Hertsmere Borough Council. Both councils will then run their own formal consultations, giving you a further opportunity to comment.

​

You can give us your feedback by:

​

  • Attending one of our public exhibitions in November

 

  • Filling in the online feedback form

 

 